The Builders Alliance team have completed a Single storey extension in Bolton, to accommodate a bespoke kitchen requested by one of our clients. Our skilled time served tradesmen have created this beautiful space for the client all in a matter of weeks, with plenty of attention to detail and professionalism throughout the whole project. We aim as a company to complete our projects always on time and within budget so the client reaps the full benefit of value to their home.
Kitchen Extensions in Bolton have increased in popularity and in fact do increase the value of the overall property, Which is one of the main reasons why our clients consider this home alteration. In this case, our client just wanted a bigger space to cook and a completely new feel to the heart of their home. We worked alongside their architect to grasp the full design idea and complete every aspect of their plan.
The builders Alliance team firstly prepared all the groundworks for the foundations on the extension, digging down till our team hit the solid ground ready for the concrete to be poured into the area. This assured our Single storey extension had a solid base to sit on. Our skilled bricklayers then started to build the External brickwork and blockwork, bonding into the old brickwork on our clients home.
The next step was to install the pitched roof onto the Extension making it watertight. This comprised of fitting the new roof joists, pattern, felt and roof tiles. As this process was undertaken our client's requested Velux windows to bring more natural lighting into the new space. Also, this was when all our first fix joinery was required for example doors, windows and frames.
Once phase Two was complete, the new room then had all its Services installed i.e Gas pipes, plumbing and Electrical fixings. Then the Kitchen was then ready for the walls to be drylined and plastered to actually look like part of the house. This was completed in a matter of days and brought this whole project together.
As you can see from the picture to your left, our team installed a bespoke centred island for this kitchen and modern style cupboards, which was personally selected by our clients from a local kitchen supplier.
This is the completed project with all the building and skilled work finished. Once we had completed installing all the new cupboards and base units is was then down to the client to add their own finishing touches to their new kitchen.
ASs you can see the client installed new drapes over their new windows and a brand new table centered in the middle of the room. We at builders alliance were very happy aswere our clients and have had many recomendations becuase of this project.